- 1、本文档共37页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法基础真题及答案解析
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality management system of the project. A management review meeting held each year, on the implementation of the quality policy, objectives and review of the problems and propose corrective measures. Efforts and resources necessary for optimal allocation of project construction management (personnel, finance, facilities, information, etc). 3.2 with customer focus project staff establish a customer-focused thinking, fully aware that meet their customers needs and expectations is the fundamental pursuit of production and services projects. Projects in production and service processes, to: 3.2.1 identify and determine the needs and expectations of the project legal person, interests as the interests of the customer, with customer satisfaction as satisfied, good faith and cooperation, win-win and development; 3.2.2 needs and expectations of the project legal person into production and service management or technical requirements, and allocation of appropriate resources; 3.2.3 meet legal requirements and strive to exceed their expectations. 3.2.4 customers on the quality of projects put into operation for standards, in accordance with the national standard of quality works. 3.2.5 regulations and standards requires the State and issued by the Ministry of the project related to the current version of the technical specifications, procedures, design institutes and
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality manag
您可能关注的文档
最近下载
- 《HJT367-2007-环境保护产品技术要求电磁管道流量计》.pdf VIP
- 2025诗词大会题库(含答案).pdf VIP
- 2025年《老年心理护理实务》课程标准(含课程思政元素).docx VIP
- 中外教育名著选读复习课程.ppt VIP
- GB50586-2010 铝母线焊接工程施工及验收规范.docx VIP
- 医院内静脉血栓栓塞症防治手册.docx VIP
- 小家电安规基本知识培训.pptx VIP
- 财务自由之路.doc VIP
- SW7203数据手册_V13926596180高效率双向升降压.pdf VIP
- 通过同品种医疗器械临床试验或临床使用获得的数据进行的分析评价报告.pdf VIP
文档评论(0)