- 1、本文档共44页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称考试经济法基础专项练习试题合集第十一部分
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 企业信息管理形成性考核册答案本科.doc
- 份莫遥汽车营销信息简报DOCP.doc
- 企业信息管理形成性考核册完整版.doc
- 企业所得税汇算清缴与地方税费结算纳税人信息修改、维护业务流程及规则正稿.doc
- 会计专业技术资格考试应试指导及全真模拟测试经济法基础.docx
- 企业法律顾问民商与经济法律知识考试大纲.doc
- 云南大学经济学含政治经济学、西方经济学考研真题及详解.doc
- 会展经济论坛策划案.doc
- 人教版小学信息技术四级第一册教案.doc
- 会计专业技术资格考试应试指导及全真模拟测试经济法基础知识点p至.docx
- 2025年中化集团方舟生招聘笔试备考题库(带答案详解).pdf
- 2025年中建西南设计院招聘笔试备考题库(带答案详解).pdf
- 2025年南通市慈善总会招聘笔试备考题库(带答案详解).pdf
- 2025年江西网吉安分站招聘笔试备考题库(带答案详解).pdf
- 2025年山西三晋都市报招聘笔试备考题库(带答案详解).pdf
- 2025年山西省高河能源招聘笔试备考题库(带答案详解).pdf
- 2024年贵州省毕节地区大方县大水乡招聘社区工作者真题含答案详解.docx
- 2024年贵州省贵阳市开阳县永温乡招聘社区工作者真题及答案详解1套.docx
- 2024年贵州省贵阳市南明区新华路街道招聘社区工作者真题及答案详解1套.docx
- 2024年贵州省遵义市仁怀市长岗镇招聘社区工作者真题及参考答案详解.docx
最近下载
- 2025年太仓市太訸控股集团有限公司第二批公开招聘19人笔试备考题库及答案解析.docx VIP
- 《食管癌综合治疗新进展》课件.ppt VIP
- 商铺租赁合同电子版下载打印.docx VIP
- 2025年太仓市太訸控股集团有限公司第二批公开招聘19人笔试参考题库附答案解析.docx VIP
- 2025年太仓市太訸控股集团有限公司第二批公开招聘19人备考题库及答案解析.docx VIP
- 《危重患者的抢救》课件.ppt VIP
- 孕产妇心肺复苏要点课件.pptx VIP
- 农村小学中高年级学生阅读兴趣培养策略研究-课题申请评审书.docx VIP
- 工程制图制图基础.ppt VIP
- 简约产品订货合同模板.docx VIP
文档评论(0)