- 1、本文档共47页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人教版小学信息技术四级第一册教案
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 46
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casin
您可能关注的文档
- 中级经济师农业经济专业知识与实务模拟试卷及答案单选集.doc
- 中级经济师商业经济专业知识与实务真题1.doc
- 中级经济师商业经济专业知识与实务真题中大网校1.doc
- 中级经济师商业经济专业知识与实务试题.doc
- 中级经济师商业经济专业知识与实务真题中大网校.doc
- 中级经济师工商管理专业知识与实务模拟试题二.doc
- 中级经济师商业经济专业知识与实务真题2.doc
- 中级经济师工商管理专业知识与实务真题.doc
- 中级经济基础讲义第三十一章1.doc
- 中级经济师工商管理专业知识与实务真题1.doc
- 2024-2025学年计算机四级考前冲刺练习题带答案详解(综合卷).docx
- 2024-2025学年计算机四级考前冲刺练习题含完整答案详解【有一套】.docx
- 2024-2025学年计算机四级考前冲刺练习题含完整答案详解【名校卷】.docx
- 2024-2025学年计算机四级考前冲刺练习题含完整答案详解【各地真题】.docx
- 2024-2025学年计算机四级考前冲刺练习题含答案详解【完整版】.docx
- 2024-2025学年计算机四级考前冲刺练习题含完整答案详解(夺冠).docx
- 2024-2025学年计算机四级考前冲刺练习题附参考答案详解(B卷).docx
- 2024-2025学年计算机四级考前冲刺练习题及答案详解(名校卷).docx
- 2024-2025学年计算机四级考前冲刺练习题含完整答案详解【全国通用】.docx
- 2024-2025学年计算机四级考前冲刺练习题附参考答案详解【名师推荐】.docx
最近下载
- 和利时LK大型PLC指令手册.pdf VIP
- 浅析莫扎特《C大调小奏鸣曲k.545》的音乐风格与演奏技巧.docx
- 2022年人教版九年级全一册物理同步教学教案.doc VIP
- 湘质监统编2020表格机器转换word版(房屋建筑工程竣工验收技术资料统一用表).docx
- 海关通关业务介绍幻灯片.ppt VIP
- 湘质监统编2020表格机器转换word版(市政基础设施工程竣工验收技术资料统一用表).docx VIP
- Roland罗兰乐器TD-11 电鼓音源TD-15 TD-11 用户手册用户手册.pdf
- 垃圾焚烧发电行业自动监控数据应用综合题库.docx VIP
- 《海关特殊监管区域通关制度》课件.ppt VIP
- 3年级劳动教案《我是厨房小帮手》.pdf VIP
文档评论(0)