- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称考试经济法基础考试试题
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality management system of the project. A management review meeting held each year, on the implementation of the quality policy, objectives and review of the problems and propose corrective measures. Efforts and resources necessary for optimal allocation of project construction management (personnel, finance, facilities, information, etc). 3.2 with customer focus project staff establish a customer-focused thinking, fully aware that meet their customers needs and expectations is the fundamental pursuit of production and services projects. Projects in production and service processes, to: 3.2.1 identify and determine the needs and expectations of the project legal person, interests as the interests of the customer, with customer satisfaction as satisfied, good faith and cooperation, win-win and development; 3.2.2 needs and expectations of the project legal person into production and service management or technical requirements, and allocation of appropriate resources; 3.2.3 meet legal requirements and strive to exceed their expectations. 3.2.4 customers on the quality of projects put into operation for standards, in accordance with the national standard of quality works. 3.2.5 regulations and standards requires the State and issued by the Ministry of the project related to the current version of the technical specifications, procedures, design institutes and
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality manag
您可能关注的文档
- 会计专业技术资格考试应试指导及全真模拟测试经济法基础知识点p至.docx
- 云南省信息技术复习最全资料.doc
- 会计专业技术资格考试经济法基础全真模拟试题六.doc
- 会计专业技术资格考试经济法基础全真模拟试题二.doc
- 会计专业技术资格考试应试指导及全真模拟测试经济法基础知识点第三章支付结算法律制度本章考情分析.docx
- 优化方案高考地理新一轮复习达标训练:第章第讲工业的区位选择.doc
- 会计专业技术资格考试经济法基础模拟试题四笔试专用.doc
- 会计专业技术资格考试经济法基础全真模拟题三.doc
- 会计从业会计基础第十章主要经济业务事项账务处理.doc
- 会计专业技术资格考试经济法基础全真模拟题五.doc
最近下载
- 墙面软包施工的方案.doc VIP
- 中国古典舞身韵-云肩转腰、云手 教案-2021-2022学年舞蹈美育七年级上册.doc
- YBT 153-2015 优质结构钢连铸坯低倍组织缺陷评级图.docx
- 湖北省武汉市部分重点中学2023-2024学年高二下学期期末联考数学试题含答案.pdf VIP
- 从生物视觉到机器之眼:生物启发式视觉识别模型与算法的深度探索.docx
- Airport English 机场英语 (详细精美图文对话单词介绍解说).ppt
- 土地整理施工方案及技术措施.docx VIP
- 19S306 居住建筑卫生间同层排水系统安装(高清版).pdf
- 工程材料力学性能第3版束德林习题答案.docx
- 2024年河南省中考语文真题(附答案解析).docx
文档评论(0)