- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
合肥工业大学机械工程工程硕士(1
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 4
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numeric
您可能关注的文档
- 全国会计专业考试经济法基础密押试卷八.docx
- 全国经济专业技术资格考试冲刺试卷经济基础知识与实务.doc
- 全国硕士研究生入学考试英语核心词汇必备商志词汇增加单元对应信息复制.doc
- 全国经济专业技术资格考试经济基础.doc
- 全国会计专业考试经济法基础密押试卷一.docx
- 全国经济专业技术资格考试试卷人力资源管理专业知识与实务初级.doc
- 全国经济专业技术资格考试试卷经济基础.doc
- 全国经济专业技术资格考试试卷经济基础中级.doc
- 信息系统项目管理师计算分析题ME.doc
- 全国经济专业技术资格考试试卷金融专业知识与实务初级.doc
- DB50_T 1532-2023兔肉分割技术规程.docx
- DB63T 1817-2020青稞豌豆混作栽培技术规范.docx
- DB65 T 3411-2012 郁金香种球(标准规范).docx
- 物流管理成本与效益管理分析.pptx
- DB50_T 1647-2024 病死生猪无害化处理生物安全防控技术规范.docx
- DB65╱2960-2009 杨树铅笔工业原料林造林技术规程.docx
- 年产含乳饮料18000吨果汁18000吨汽水36500吨项目可行性研究报告模板-立项备案.doc
- 传统行业短视频电商直播带货网红带货营销策划方案图文PPT课件.pptx
- DB6101∕T 3108-2021 工业用离心压缩机优化设计流程(西安市).docx
- 祁连圆柏容器苗造林技术规程 __DB63_T1861-2020 青海.docx
文档评论(0)