- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吉林大学经济学政治经济学、西方经济学考研真题及详解
Born to win __________________________________________________经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of t
您可能关注的文档
- 全国经济专业技术资格考试试卷金融经济专业知识与实务中级.doc
- 全国经济专业财政税收专业知识与实务试卷.doc
- 全国经济专业技术资格考试试卷商业经济专业知识与实务中级.doc
- 全国自学考试国际经济法概论历真题.doc
- 全国自学考试涉外经济法历真题.doc
- 全国高等教育自学考试国际经济法概论试题及答案.doc
- 全国高等教育自学考试计量经济学试题.doc
- 全国高等教育自学考试计量经济学试题1.doc
- 全国经济专业技术资格考试金融专业知识与实务试卷初级.doc
- 全国经济专业技术资格考试试卷财政税收专业知识与实务中级.doc
- Unit1-Unit8基础知识练习人教版七年级英语下册.docx
- 人教版数学八年级下册(2).pptx
- 自然选择与适应的形成课件-高一下学期生物人教版必修2(1).pptx
- 湖北省荆州中学高三第十三次周考文科综合试题扫描版含答案.doc
- Unit3Readingforwriting课件-外研版英语七年级下.pptx
- 11.《种树郭橐驼传》课件统编版高二语文选择性必修下册.pptx
- 2.7《近似数》课件浙教版七年级数学上册(1).pptx
- 第七单元5平行四边形的特征及性质(课件)-四年级数学下册(苏教版).pptx
- 历史高考创新通史岳麓版课件阶段八课时2从抗日战争到新民主主义革命的胜利.pptx
- 圆周角课件湘教版九年级数学下册(1).pptx
文档评论(0)