- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国高等教育自学考试计量经济学试题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is
您可能关注的文档
- 中级经济师考试经济基础知识真题及答案私人整理打印版.doc
- 中级经济师考试房地产经济专业知识与实务考前突破卷1.doc
- 中级经济师考试财政税收专业知识与实务备考习题卷.doc
- 中级经济师考试财政税收专业知识与实务备考习题1.doc
- 中级经济师考试财政税收专业知识与实务常考题型.doc
- 中级经济师考试财政税收专业知识与实务成功过关试题.doc
- 中级经济师考试模拟试卷财政税收.doc
- 中级经济师考试财政税收专业知识与实务临考特效卷.doc
- 中级经济师考试财政税收专业知识与实务提分卷.doc
- 中级经济师考试经济基础知识全真模拟试卷中大网校.doc
- 2.1神经调节的结构基础 课件 人教版高中生物学选择性必修1.pptx
- 2.2.1算术平方根 课件 北师大版数学八年级上册.pptx
- 2.3.1细胞通过分裂而增殖 课件(内嵌视频3个)初中生物学北师大版(2024)七年级上册.pptx
- 2.3.2细胞分化形成组织 课件 初中生物学北师大版(2024)七年级上册.pptx
- 4.3.1 角与角的大小比较 课件 2025-2026学年湘教版数学七年级上册.pptx
- 2.3.3生物体的器官、系统 课件 初中生物学北师大版(2024)七年级上册.pptx
- 聚异氰酸酯行业商业计划书.docx
- 2.4节神经系统的分级调节 课件 人教版高中生物学选择性必修1.pptx
- 【公开课】探索勾股定理第1课时(课件)数学北师大版2024八年级上册.pptx
- 综合实践 一天的时间(课件)2025-2026学年度苏教版数学三年级上册.pptx
文档评论(0)