- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
复旦大学经济学综合基础有效复习范围
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +1
您可能关注的文档
- 初级建筑经济师专业知识与实务大纲.doc
- 初级经济师民航运输模拟题.doc
- 初级经济师工商管理专业知识与实务考试辅导必背.docx
- 初级经济师经济基础知识考试大纲.doc
- 初级经济师考试人力资源管理专业知识与实务真题.doc
- 初级经济师商业经济专业知识与实务真题.doc
- 初级经济师考试工商管理真题及答案.doc
- 初级经济师考试金融专业知识与实务真题及答案.doc
- 初级经济师房地产经济专业知识与实务真题.doc
- 初级经济师财政税收专业知识与实务真题.doc
- 毕业设计(论文)-橘子去皮剥皮机设计.docx
- 2024-2025学年仓储管理人员题库试题附参考答案详解(满分必刷).docx
- XX地区文化旅游融合项目投资可行性研究报告.docx
- 跨境珠宝电商供应链整合与协同效应研究报告.docx
- 2024-2025学年仓储管理人员题库试题(黄金题型)附答案详解.docx
- 电商平台用户留存策略:2025年会员体系设计与运营指南.docx
- 2025年跨境旅游行业用户满意度提升策略与服务质量改进报告.docx
- 2025年社区维修服务智能预约平台市场推广策略研究报告.docx
- 跨境珠宝电商供应链整合升级对行业供应链管理的影响报告.docx
- 生物医药企业国际化战略与市场拓展.docx
最近下载
- 用人单位劳动合同模板.doc VIP
- 华熙生物-投资价值分析报告:全球最大透明质酸生产商的产业链延伸.pdf VIP
- 20200522-中信证券-华熙生物-688363-投资价值分析报告:研发驱动,服务美好生活.pdf VIP
- 医药生物行业:华熙生物,全球透明质酸领军企业.docx VIP
- 2025年校园监控系统方案(四篇).pdf VIP
- 2025广西公需科目考试答案(3套涵盖95-试题)一区两地一园一通道建设人工智能时代的机遇与挑战.docx VIP
- 华熙生物-投资价值分析报告-透明质酸,供需双振_20200413.pdf VIP
- 2025年校企合作实训项目设计与实施案例报告.docx
- 华熙生物-投资价值分析报告-全球透明质酸龙头,积极延伸医疗美妆终端.pdf VIP
- 重庆市巴蜀初一入学分班语文试卷版.doc VIP
文档评论(0)