- 1、本文档共40页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
太原市文明创建信息系统操作手册
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 40
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing
您可能关注的文档
- 加快转变经济发展方式的重点和难点下.doc
- 办公信息设备使用、维护管理办法.doc
- 劳动经济学复习资料用.doc
- 化工行业信息报道总第期化工报道.doc
- 北航工业工程领域专硕培养方案.doc
- 北京丰台总部基地建设对丰台区发展的经济效应的探讨.doc
- 北航西方经济学.doc
- 北语秋劳动经济学作业.docx
- 北京工业大学毕业手册B副本.doc
- 北语秋劳动经济学作业1.docx
- 剧本杀行业报告:内容创作规范与剧本市场拓展策略.docx
- 剧本杀行业区域市场区域文化特色与市场潜力分析报告.docx
- 剧本杀行业区域市场拓展实战案例研究.docx
- 剧本杀行业区域市场拓展路径与模式探索报告.docx
- 剧本杀行业区域市场竞争态势与品牌差异化策略研究报告.docx
- 剧本杀行业2025年西北区域市场市场细分领域竞争态势与品牌竞争策略分析研究报告.docx
- 剧本杀行业2025年西北市场拓展前景预测报告.docx
- 剧本杀行业2025年长沙市场发展潜力分析报告.docx
- 剧本杀行业2025年长三角市场竞争策略与布局分析.docx
- 医疗行业数据合规:2025年数据安全法实施后的合规监管挑战与应对.docx
最近下载
- 2024新沪教版版九年级上册化学各章节必背知识点复习提纲.docx VIP
- 高中数学-思维导图(60图).pdf VIP
- 饮水机清洁技巧课件.pptx VIP
- 放学路上作文600字.docx VIP
- 应急大队档案培训.pptx
- 人体解剖学(第二版):消化系统PPT全套教学课件.pptx VIP
- 2012年下半年小学教师资格证考试真题《教育教学知识与能力》(附答案).pdf VIP
- 18.6审理旅游纠纷案件适用法律的规定(政策与法律法规 第7版).pptx VIP
- 作风建设专题党课讲稿2篇:加强作风建设,推动高质量发展.docx VIP
- (四升五)四年级语文暑假特色作业(可修改可打印).docx VIP
文档评论(0)