- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
北京工业大学毕业手册B副本
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 10
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numeri
您可能关注的文档
- 信息化能力建设公共课培训多选题.doc
- 信息化能力建设+科学素养和科研方法份模拟试卷及题库.doc
- 信息工作与三服务要诀.doc
- 信息技术与信息安全知识问答器.doc
- 信息安全教程考试复习题下载.doc
- 信息技术单选题含答案.docx
- 信息快报第期总第期.doc
- 信息技术基础参考教案二十一.doc
- 信息工程出租车计价器设计.doc
- 信息产业部ERP管理咨询师考试真题.doc
- 山东东营市财金投资集团招聘笔试题库附参考答案详解(模拟题).docx
- 山东东营市财金投资集团招聘笔试题库附参考答案详解(实用).docx
- 山东东营市财金投资集团招聘笔试题库附参考答案详解(综合题).docx
- 山东东营市财金投资集团招聘笔试题库附参考答案详解(完整版).docx
- 广东省深圳中学共同体联考九年级上学期期中考试语文试题(含答案).docx
- 山东东营市财金投资集团招聘笔试题库附参考答案详解(名师推荐).docx
- 胰岛素的应用.pptx
- 广东省深圳市六年级下册期中数学试卷及答案(北师大版).docx
- 山东东营市财金投资集团招聘笔试题库附参考答案详解(b卷).docx
- 山东临沂市国企市财金集团招聘笔试题库及完整答案详解一套.docx
文档评论(0)