- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安徽工业大学洪功翔:国有企业效率研究进展
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the correspondingPAGE 10
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirement
您可能关注的文档
- 北语秋劳动经济学作业.docx
- 北京工业大学毕业手册B副本.doc
- 北语秋劳动经济学作业1.docx
- 医药产业经济运行分析.docx
- 华东政法大学经济法专业毕业学.doc
- 十角度解析石油下跌对全球经济、市场的影响.docx
- 华锐风电科技集团股份有限公司届招聘信息.doc
- 北京制线厂经济适用房##双排脚手架工程施工方案.doc
- 华南农业大学工业工程考研大纲.doc
- 北京市外向型经济发展战略问题网络.doc
- 剧本杀行业报告:内容创作规范与剧本市场拓展策略.docx
- 剧本杀行业区域市场区域文化特色与市场潜力分析报告.docx
- 剧本杀行业区域市场拓展实战案例研究.docx
- 剧本杀行业区域市场拓展路径与模式探索报告.docx
- 剧本杀行业区域市场竞争态势与品牌差异化策略研究报告.docx
- 剧本杀行业2025年西北区域市场市场细分领域竞争态势与品牌竞争策略分析研究报告.docx
- 剧本杀行业2025年西北市场拓展前景预测报告.docx
- 剧本杀行业2025年长沙市场发展潜力分析报告.docx
- 剧本杀行业2025年长三角市场竞争策略与布局分析.docx
- 医疗行业数据合规:2025年数据安全法实施后的合规监管挑战与应对.docx
最近下载
- 2024新沪教版版九年级上册化学各章节必背知识点复习提纲.docx VIP
- 高中数学-思维导图(60图).pdf VIP
- 饮水机清洁技巧课件.pptx VIP
- 放学路上作文600字.docx VIP
- 应急大队档案培训.pptx
- 人体解剖学(第二版):消化系统PPT全套教学课件.pptx VIP
- 2012年下半年小学教师资格证考试真题《教育教学知识与能力》(附答案).pdf VIP
- 18.6审理旅游纠纷案件适用法律的规定(政策与法律法规 第7版).pptx VIP
- 作风建设专题党课讲稿2篇:加强作风建设,推动高质量发展.docx VIP
- (四升五)四年级语文暑假特色作业(可修改可打印).docx VIP
文档评论(0)