- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
十角度解析石油下跌对全球经济、市场的影响
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 信息技术与信息安全知识问答器.doc
- 信息安全教程考试复习题下载.doc
- 信息技术单选题含答案.docx
- 信息快报第期总第期.doc
- 信息技术基础参考教案二十一.doc
- 信息工程出租车计价器设计.doc
- 信息产业部ERP管理咨询师考试真题.doc
- 信息技术培训试题含答案.doc
- 低碳经济考卷含答案.doc
- 信息技术学业水平测试最新选择题.doc
- 2024年湖南省郴州市桂东县增口乡招聘社区工作者真题及完整答案详解1套.docx
- 2024年甘肃省临夏州和政县陈家集乡招聘社区工作者真题及答案详解一套.docx
- 2024年湖南省郴州市桂东县东洛乡招聘社区工作者真题及参考答案详解一套.docx
- 2024年湖南省长沙市浏阳市沿溪镇招聘社区工作者真题及参考答案详解一套.docx
- 2024年湖南省郴州市永兴县洞口乡招聘社区工作者真题附答案详解.docx
- 2024年甘肃省临夏州康乐县八丹乡招聘社区工作者真题及完整答案详解1套.docx
- 2024年湖南省郴州市资兴市兴宁镇招聘社区工作者真题及答案详解一套.docx
- 2024年湖南省郴州市永兴县千冲乡招聘社区工作者真题带答案详解.docx
- 2024年湖南省郴州市永兴县太和乡招聘社区工作者真题及参考答案详解.docx
- 2024年甘肃省临夏州和政县罗家集乡招聘社区工作者真题及参考答案详解一套.docx
文档评论(0)