- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工业给服装行业带来新机遇
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 吉林大学经济学政治经济学、西方经济学考研真题及详解1.doc
- 吴树青政治经济学资本主义部分笔记第章资本主义土地所有权与地租.doc
- 吴树青政治经济学资本主义部分课后习题详解第章生息资本和利息.doc
- 吴树青政治经济学资本主义部分课后习题详解第章商品生产和商品流通.doc
- 吉林大学经济学考研真题及详解.doc
- 吴树青政治经济学资本主义部分笔记第章职能资本与平均利润.doc
- 咨询工程师宏观经济政策与发展规划真题及答案.doc
- 吴树青政治经济学资本主义部分课后习题详解第章资本主义土地所有权与地租.doc
- 吴树青政治经济学资本主义部分课后习题详解第章国家垄断资本主义.doc
- 哈尔滨航空工业集团有限公司.doc
最近下载
- 高压变频装置配套用移相整流变压器.pdf VIP
- 风湿免疫患者护理优秀ppt.pptx VIP
- 《骆驼祥子》读书分享PPT课件(精选图文).pptx VIP
- 消毒剂消毒效果验证方案1..doc VIP
- 大家的日语单词表(打印版).docx VIP
- 【A-1】职能部门对在护理安全管理中存在的问题进行追踪和成效评价,持续改进。.docx VIP
- 高压变频装置配套用移相整流变压器设计研究.doc VIP
- 麒麟区村干部任期和离任经济责任审计主要做法、成效及改进研究.doc VIP
- 心电图avR导联ST段抬高对左主干病变的判定及临床意义.doc VIP
- 2025年高考日语试卷试题真题及答案详解(精校打印版) .pdf
文档评论(0)