- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设工程经济模拟测试题一
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 吴树青政治经济学资本主义部分课后习题详解第章资本主义土地所有权与地租.doc
- 吴树青政治经济学资本主义部分课后习题详解第章国家垄断资本主义.doc
- 哈尔滨航空工业集团有限公司.doc
- 吴树青政治经济学资本主义部分课后习题详解第章资本的积累过程.doc
- 吴树青政治经济学资本主义部分笔记第章垄断资本主义的形成和发展.doc
- 四川农大信息检索与利用网教本科.doc
- 国内工业设计行业研究.docx
- 吴树青政治经济学资本主义部分课后习题详解第章资本的流通过程.doc
- 嘉兴鉴版信息化建设与信.doc
- 吴树青政治经济学资本主义部分笔记第章垄断条件下的资本关系.doc
- DB23_T 3866-2024冰上龙舟赛事组织服务规范.docx
- DB32 2163-2012 棉纱单位可比综合电耗限额及计算方法.docx
- DB32∕T 2429-2013 棉花田间生长发育观察记载规范.docx
- DB23_T 3820-2024 工业互联网综合平台数据质量管理规范.docx
- DB23_T 3474-2023非煤智慧矿山信息系统技术规范.docx
- DB3201_T 1106-2022 工程地质层划分技术规范.docx
- DB33T 2515-2022公共机构“零碳”管理与评价规范.docx
- DB3301_T 0415-2023 装修垃圾收运处置管理规范.docx
- DB3311/T 106―2019“丽水山居”民宿服务要求与评价规范.docx
- DB3201T 1127-2022 慈善捐赠受赠管理规范.docx
文档评论(0)