- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
张维达政治经济学第版习题详解第章自然经济和商品经济
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 国际商务师考试经济法概论.doc
- 国际经济与贸易专业毕业论文题目汇总.doc
- 国际经济与贸易本.doc
- 国际经济与贸易培养计划.doc
- 国家关于农业的政策.doc
- 国际经济法任务任务11.doc
- 国际经济法名词解释(1.doc
- 国际经济学名词解释修正版.doc
- 国民经济核算教学大纲.doc
- 国际经济法学教学大纲.doc
- 公务员考试时事政治能力测试B卷含答案详解(综合题).docx
- 公务员考试时事政治能力检测及参考答案详解【预热题】.docx
- 公务员考试时事政治过关检测试卷含答案详解(名师推荐).docx
- 公务员考试时事政治能力测试B卷及一套参考答案详解.docx
- 公务员考试时事政治试题预测试卷(精选题)附答案详解.docx
- 公务员考试时事政治能力测试备考题【真题汇编】附答案详解.docx
- 2024焦作师范高等专科学校《形势与政策》期末考试考试彩蛋押题及完整答案详解一套.docx
- 2024重庆电力高等专科学校《形势与政策》期末考试考试黑钻押题【考试直接用】附答案详解.docx
- 2024年重庆对外经贸学院《形势与政策》期末考试全真模拟模拟题及参考答案详解(A卷).docx
- 2024湖南邮电职业技术学院《形势与政策》期末考试复习提分资料附参考答案详解(模拟题).docx
最近下载
- 中国糖尿病足诊治指南(2024版)解读.pptx VIP
- 《中国保险业意外伤害经验发生率表(2021)》.pdf VIP
- 安伯格GRP1000 IMS技术详细说明.docx VIP
- 采购变更管理方案.docx VIP
- 电网调度规程.pptx VIP
- WS∕T 779-2021 儿童血细胞分析参考区间.pdf
- 2025浙江省“三支一扶”计划招募270人笔试备考试题及答案解析.docx VIP
- 通信工程师中级考试(传输与接入有线务实)2021真题.pdf VIP
- 全国服装设计与工艺赛项理论知识试题及答案.doc VIP
- DB3707_T 033-2021 智慧供热系统建设技术规范.docx VIP
文档评论(0)