- 1、本文档共59页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
循环经济与低碳经济公共课培训考试资料大全
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 复旦大学经济学综合基础金融+经济学综合考研真题及答案解析汇编.docx
- 埃及摄影旅游实用信息指南.doc
- 大学信息技术基础B复习.doc
- 多媒体与信息集成教案.doc
- 复旦大学经济学综合基础有效复习范围.doc
- 大学西方经济学第章习题.doc
- 多温区回流焊接机HL和经济型六温区电脑式无铅回流焊价格.docx
- 复旦大学经济学综合基础考研真题及详解1.doc
- 大通研究三月份投资策略doc宏观经济分析.doc
- 姚洋发展经济学考试重点+每章总结北京大学出版社.docx
- 2025年城市公园智慧化跨境生态监测技术合作策略分析报告.docx
- 2025年家居用品跨境电商设计众创平台市场前景分析.docx
- 非内界膜剥离玻璃体切除术治疗病理性近视黄斑劈裂的疗效探究.docx
- 2025年快消品企业促销活动促销效果评估跨学科研究.docx
- 2025年宠物医疗跨境远程会诊平台市场服务模式创新与市场竞争力报告.docx
- 2025年城市地下停车场智慧缴费系统运营模式与商业模式创新报告.docx
- 2025年快递企业智能化运营:快递分拣与配送一体化模式创新策略研究.docx
- 我国上市公司股权激励、管理层权力与企业绩效的关联性探究.docx
- 2025年文具礼品电商跨境保税仓储扩建投资回报率分析报告.docx
- 2025年小米智能生态产品矩阵技术创新与产业变革研究报告.docx
文档评论(0)