- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
曼昆经济学原理微观经济学分册第版课后习题详解第章微观经济学前沿
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 工业集团招商公司策划体系工作指引请审批.doc
- 工业通风与除尘课程设计指导书新.doc
- 工业过滤器klkldzzv和供应滤油车价格.docx
- 工程经济模拟试卷六1.doc
- 工程经济考试考点与重点.doc
- 工程经济知识点整理三工程估价.doc
- 工业过滤器klkldzzv和液压油滤油机价格.docx
- 工程经济与管理复习.doc
- 巴州阿瓦提农场创建农业部园艺作物标准园工作总结.doc
- 市场经济学阶段作业.doc
- 2025年跨境电商助力乡村特色农产品品牌国际化品牌国际化战略规划与实施.docx
- 城市公共自行车系统2025年智能化运维与成本控制报告.docx
- 2024年自考专业(计算机网络)考前冲刺试卷及答案详解【真题汇编】.docx
- 城市公园智慧导览与安防联动系统2025年技术突破与产业合作研究.docx
- 生物科技企业2025年技术转化创新趋势预测报告.docx
- 新能源汽车换电模式下的电池回收处理政策与市场分析2025年报告.docx
- 2025年游戏化营销策略助力品牌传播深度分析报告.docx
- 2025年农产品冷链物流冷链物流行业市场细分与竞争格局研究报告.docx
- 茶饮品牌2025年市场扩张中的供应链管理与竞争报告.docx
- 2025年家长在线教育付费意愿与教育科技企业品牌建设研究报告.docx
最近下载
- DB37∕T 242-2021 建筑消防设施检测技术规程.docx
- PE管材验收标准(SDR17.6).docx VIP
- 复旦大学《计算机体系结构》期末考试两套试卷(含答案).pdf VIP
- 中国近现代史纲要知到课后答案智慧树章节测试答案2025年春海南大学.docx VIP
- 形考作业3:基于UML的大学图书馆图书信息管理系统设计实验.docx VIP
- 大学《地震工程学》课程课件.pptx
- 2024年二建继续教育-基于建筑信息模型、虚拟施工及网络的项目管理理论及实践1、2答案.docx VIP
- 2024年二建继续教育-剖析价值工程及如何运用价值工程优选设计方案1、2答案.docx VIP
- 茶颜悦色案例分析.pptx VIP
- yolov9论文中文翻译.docx VIP
文档评论(0)