- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
核电信息周刊1
核电信息周刊
NuclearPowerInformationWeekly
核电信息周刊
NuclearPowerInformationWeekly
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 18
PAGE 18
2011年02月
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements
您可能关注的文档
最近下载
- 《七律二首 送瘟神》-中职语文高二同步课件精选(高教版2023·职业模块).pptx VIP
- 高考蓝皮书·物理试题分析2025.docx VIP
- 综合实践活动 开学第一课 2024-2025学年综合实践活动开学第一课课件.pptx VIP
- 高标准农田监理大纲方案投标文件(技术方案).doc
- 小儿过敏性休克抢救流程.pptx VIP
- 液压与气压传动技术完整整套教学课件.pdf VIP
- 技术标投标文件监理大纲.doc VIP
- 2025 年成都市三年级数学秋季开学摸底考 - 冲刺卷及答案(北师大版).docx VIP
- 最新2025年《初中初三开学第一课》全文.pptx VIP
- 姓氏的由来演讲课件(张姓).pptx VIP
文档评论(0)