- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工业生产与地理环境教案镇江市丹徒高级中学李斌翔
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 8
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerica
您可能关注的文档
- 四川农大信息检索与利用网教本科.doc
- 国内工业设计行业研究.docx
- 吴树青政治经济学资本主义部分课后习题详解第章资本的流通过程.doc
- 嘉兴鉴版信息化建设与信.doc
- 吴树青政治经济学资本主义部分笔记第章垄断条件下的资本关系.doc
- 国内经济型酒店的市场研究及S管理应用.doc
- 吴树青政治经济学资本主义部分课后习题详解第章垄断资本主义的劳资关系.doc
- 呼和浩特市房地产市场信息.doc
- 国家级经济技术开发区管理体制类型研究秦皇岛开发区管委会吕爱国.doc
- 国家信息中心房地产动态.doc
- 建设工程经济模拟试题一.doc
- 张掖市誉宇农业机械科技有限责任公司修建性详细规划.doc
- 张维达政治经济学第版习题详解第章中国社会主义初级阶段的基本经济制度.doc
- 张维达政治经济学第版习题详解导论.doc
- 张维达政治经济学第版习题详解第章自然经济和商品经济.doc
- 张维达政治经济学第版习题详解第章社会总供求和国家宏观调控.doc
- 张维达政治经济学第版习题详解第章经济发展和经济社会可持续发展.doc
- 张维达政治经济学第版笔记第章市场经济运行中的市场机制和市场体系.doc
- 张维达政治经济学第版笔记第章对外经济开放和生产要素的国际流动.doc
- 张维达政治经济学第版习题详解第章资本主义经济制度.doc
文档评论(0)