- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
张维达政治经济学第版习题详解第章经济发展和经济社会可持续发展
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 国际经济法形考任务1.doc
- 国际经济法任务任务2.doc
- 国际经济法简述、问答、案例答案.doc
- 国际经济法考前模拟题.doc
- 国际经济法综合测试题.doc
- 国际经济法概论串讲第章国际税法.doc
- 国际经济法第三次网上作业.doc
- 国际经济法综合辅导附答案.doc
- 地大秋学期西方经济学在线作业二答案.doc
- 地方信息产业政策研究和立法研究目录.doc
- 2025年国家统计局北流调查队关于招聘编外工作人员的(1人)模拟试卷及完整答案详解一套.docx
- 2025年度中国质量检验检测科学研究院招聘工作人员(1人)笔试备考试题带答案详解.docx
- 2025年巴林左旗林业和草原局关于国有公益林护林员招聘(66人)考前自测高频考点模拟试题附答案详解(.docx
- 2025年广西河池市罗城仫佬族自治县农业农村局关于招募特聘农技员模拟试卷含答案详解(轻巧夺冠).docx
- 2025年平凉市静宁县城镇公益性岗位人员招聘(78人)考前自测高频考点模拟试题及一套完整答案详解.docx
- 2025年广州市海珠区华洲街道招聘雇员(4人)模拟试卷及一套答案详解.docx
- 2025年宜昌市西陵区选调事业单位工作人员(3人)模拟试卷及答案详解(网校专用).docx
- 2025年威海市互联网信息中心公开招聘急需紧缺专业技术人才考试事项模拟试卷附答案详解(精练).docx
- 2025年广州黄埔区长洲街道招聘政府聘员(3人)笔试备考试题及答案详解(基础+提升).docx
- 2025年宜昌市猇亭区招聘化工园区专职工作人员(6人)模拟试卷有完整答案详解.docx
文档评论(0)