- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际经济法考前模拟题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 初级会计职称经济法基础真题2.doc
- 初级会计职称经济法基础真题1.doc
- 初级会计职称经济法基础真题及答案解析1.doc
- 初级会计职称经济法基础最新试题中大网校.doc
- 初级会计职称经济法基础第三章强化习题及答案(1.doc
- 初级会计职称经济法基础模拟真题.doc
- 初级会计职称经济法基础模拟真题1.doc
- 初级会计职称经济法基础第六章强化习题及答案.doc
- 初级会计考试经济法基础试题及答案.doc
- 初级会计职称经济法基础考试题及答案和解析.doc
- 场地脚手架工程施工方案(3篇).docx
- 2024年浙江省丽水市松阳县玉岩镇招聘社区工作者真题及参考答案详解一套.docx
- 2024年河南省郑州市惠济区古荥镇招聘社区工作者真题及答案详解一套.docx
- 2024年浙江省杭州市淳安县文昌镇招聘社区工作者真题及完整答案详解1套.docx
- 2024年浙江省台州市三门县小雄镇招聘社区工作者真题带答案详解.docx
- 2024年浙江省宁波市余姚市河姆渡镇招聘社区工作者真题及完整答案详解1套.docx
- 2024年浙江省丽水市景宁畲族自治县雁溪乡招聘社区工作者真题及答案详解一套.docx
- 2024年浙江省杭州市临安市板桥乡招聘社区工作者真题及答案详解一套.docx
- 2024年湖北省宜昌市点军区土城乡招聘社区工作者真题及答案详解一套.docx
- 2024年浙江省台州市路桥区桐屿街道招聘社区工作者真题附答案详解.docx
最近下载
- JGJ33-2012 建筑机械使用安全技术规程.docx VIP
- TB_10307-2020 铁路通信、信号、信息工程施工安全技术规程.docx VIP
- 简明新疆地方史读本电子版 .pdf VIP
- 基于PLC的加热反应炉自动控制系统设计.pdf VIP
- 抗病毒药物的合理使用课件.pptx VIP
- TB10181-2017 铁路隧道盾构法技术规程.docx VIP
- 静脉输液课件(共87张PPT).pptx VIP
- 《商业银行经营与管理》22春平时作业1答卷.doc VIP
- 2024-2025学年小学美术五年级上册桂美版(2024)教学设计合集.docx
- 2022年版初中物理课程标准新课标考试题库及答案1 .pdf VIP
文档评论(0)