- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
经济师考试中级财政税收知识点:消费税制
HYPERLINK 正保远程教育(美国纽交所上市公司 代码:DL)
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square sca
您可能关注的文档
最近下载
- 压力检测及仪表.ppt
- DGTJ08-202-2020钻孔灌注桩施工规程 上海市.pptx VIP
- 光伏发电站场内及并网安全技术白皮书.pdf
- API SPEC 4F 钻井和修井井架、底座规范1995.doc VIP
- 2023年09月浙江温州市平阳县部分事业单位面向高校毕业生退役士兵公开招聘6人笔试历年难易错点考题荟萃附带答案详解_1.docx VIP
- 《中华人民共和国安全生产法》培训解读课件.pptx VIP
- 《中华人民共和国安全生产法》解读与培训.pptx VIP
- 电子商务专业课程体系构建与实践教学方案.docx VIP
- 《中华人民共和国矿山安全法实施条例》深度解读课件.pptx VIP
- 【温州】2024年浙江温州平阳县部分事业单位面向高校毕业生退役士兵招聘工作人员6人笔试历年典型考题及考点剖析附带答案详解.docx VIP
文档评论(0)