- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东莞会计从业资格考试初级会计电算化押密模拟试题
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before th
您可能关注的文档
- 逄锦聚政治经济学第版笔记第十八章社会注意宏观经济运行.doc
- 逄锦聚政治经济学第版笔记第十三章资本主义的历史地位和发展趋势.doc
- 逄锦聚政治经济学第版课后习题详解第二章商品和价值.doc
- 逄锦聚政治经济学第版课后习题详解第十七章社会主义市场经济的微观基础.doc
- 逄锦聚政治经济学第版课后习题详解第十二章经济全球化和资本主义国际经济关系.doc
- 逄锦聚政治经济学第版课后习题详解第十五章社会主义初级阶段及其基本经济制度.doc
- 逄锦聚政治经济学第版课后习题详解第一章生产力、生产关系和生产方式.doc
- 逄锦聚政治经济学第版课后习题详解第九章资本主义的分配.doc
- 逄锦聚政治经济学第版课后习题详解第五章社会总资本再生产和市场实现.doc
- 逄锦聚政治经济学第版课后习题详解第三章货币与货币流通.doc
最近下载
- (正式版)SH∕T 3553-2024 石油化工汽轮机施工及验收规范.pdf VIP
- 电气专项施工方案.doc VIP
- 个人简历——【标准模板】.doc VIP
- 软件开发工具unsp ide使用说明书.pdf VIP
- 【课堂新坐标(教师用书)高中英语 Unit 3 Period V Culture Corner & Bulletin Board课件 北师大版必修1.ppt VIP
- 老年病多学科诊疗模式.pptx VIP
- GPX 生产手册.pdf VIP
- 老年病多学科诊疗模式.pptx VIP
- 【课堂新坐标(教师用书)高中英语 Unit 1 Lifestyles单元归纳提升课件 北师大版必修1.ppt VIP
- 新课标高中英语 教师用书配套资料 Unit1~2 阶段综合检测 北师大版必修1.doc VIP
文档评论(0)