- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东莞会计培训机构金帐本第三季度会计从业资格考试财经法规模拟题十
金帐本会计学习平台
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE - 18 -
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch to
您可能关注的文档
- 逄锦聚政治经济学第版笔记第十三章资本主义的历史地位和发展趋势.doc
- 逄锦聚政治经济学第版课后习题详解第二章商品和价值.doc
- 逄锦聚政治经济学第版课后习题详解第十七章社会主义市场经济的微观基础.doc
- 逄锦聚政治经济学第版课后习题详解第十二章经济全球化和资本主义国际经济关系.doc
- 逄锦聚政治经济学第版课后习题详解第十五章社会主义初级阶段及其基本经济制度.doc
- 逄锦聚政治经济学第版课后习题详解第一章生产力、生产关系和生产方式.doc
- 逄锦聚政治经济学第版课后习题详解第九章资本主义的分配.doc
- 逄锦聚政治经济学第版课后习题详解第五章社会总资本再生产和市场实现.doc
- 逄锦聚政治经济学第版课后习题详解第三章货币与货币流通.doc
- 邢台市英才辅导初三历史一轮专题训练战后美国经济发展c.doc
最近下载
- (正式版)SH∕T 3553-2024 石油化工汽轮机施工及验收规范.pdf VIP
- 电气专项施工方案.doc VIP
- 个人简历——【标准模板】.doc VIP
- 软件开发工具unsp ide使用说明书.pdf VIP
- 【课堂新坐标(教师用书)高中英语 Unit 3 Period V Culture Corner & Bulletin Board课件 北师大版必修1.ppt VIP
- 老年病多学科诊疗模式.pptx VIP
- GPX 生产手册.pdf VIP
- 老年病多学科诊疗模式.pptx VIP
- 【课堂新坐标(教师用书)高中英语 Unit 1 Lifestyles单元归纳提升课件 北师大版必修1.ppt VIP
- 新课标高中英语 教师用书配套资料 Unit1~2 阶段综合检测 北师大版必修1.doc VIP
文档评论(0)