- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级会计职称考试财务管理试题及答案3
PAGE 14 / NUMPAGES 15 大家网 TopS
TopS 大家网 PAGE 15 / NUMPAGES 15
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be大家学习网 HYPERLINK 更多精品在大家!
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requiremen
您可能关注的文档
最近下载
- Unit 1 Fun numbers and letters (说课稿)-2024-2025学年人教PEP版(一起)(2024)英语二年级上册.docx VIP
- 印刷成本核算方式.docx VIP
- 森林防火教学课件.ppt VIP
- 二级保密资格档案目录(24盒)优质材料.doc VIP
- 2025水利工程五大员专业题库(含答案).docx VIP
- 图书馆业务知识培训ppt课件.pptx VIP
- 传感器智能传感器与无线传感器网络技术.pptx VIP
- 中国共产党基层组织选举工作条例学习宣贯ppt课件.pptx VIP
- 游消费者行为学(第二版)孙九霞全套PPT课件.pptx
- 东芝 e-STUDIO 2000AC 2500AC 彩色复印机维修手册(拆卸安装篇).pdf VIP
文档评论(0)