- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
度全国会计专业技术资格考试1
北京达德培训: 成人高考大专大本 专升本(经管类、理工类、文史类) 人力资源管理师 电脑全科 会计取证 助理会计师 会计师 会计实操 会计继续教育—北京市财政局指定培训院校 专线position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 18
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level t
您可能关注的文档
最近下载
- 《钢结构设计规范》(正文)征求意见稿.doc VIP
- 植物生理学课件(王小菁-第8版)-第十三章-植物对胁迫的应答与适应.pptx VIP
- 《秋季中医养生》PPT课件.pptx
- Ⅱ型隔水式电热恒温培养箱PYX-DHS-BS说明书.doc VIP
- 植物生理学课件(王小菁-第8版)-第五章-植物同化物的运输.pptx VIP
- 中国溶剂油项目投资计划书.docx
- 智能制造系统集成应用(初级)任务8 工业机器人控制系统安装.ppt VIP
- 2025年中国半乳甘露聚糖项目创业计划书.docx
- 植物生理学课件(王小菁-第8版)-第十章-植物的生长生理.pptx VIP
- 人教(PEP)版三年级上册英语Unit 4《Plants around us》全单元教学课件(新教材).pptx
文档评论(0)