基于蠕变效应的穿缘慕隧道冻结帷幕开挖与支护三维数值模拟.pdfVIP

  • 3
  • 0
  • 约2.57万字
  • 约 6页
  • 2017-05-05 发布于浙江
  • 举报

基于蠕变效应的穿缘慕隧道冻结帷幕开挖与支护三维数值模拟.pdf

基于蠕变效应的穿缘慕隧道冻结帷幕开挖与支护三维数值模拟

26 Vol.26 Supp. 2005 5 Rock and Soil Mechanics May 2005 (2005)12105 1,2 2 3 4 (1. 210096 2. 100013 3. 200030 4. 200020 MARC TV 64 A 3D creep numerical simulation of excavation and support in frozen soil curatin wall of crossing tunnel LI Fang-zheng1,2 2 3 4 , LOU Gen-da , YU Zhi-song , LI Xiao-jun (1. Institute of Geotechnical Engineering, Southeast University, Nanjing 210096, China; 2. Beijing Coal Mine Co. Ltd, Beijing 100013, China; 3. Shanghai Tunnel Engineering Corporation, Shanghai 200030, China; 4. Tongji University, Shanghai 200020, China) Abstract: The creep property of artificial frozen soil curtain wall is obvious. In the calculating model which is based on the tunnel crossing the bottom plate of using station in Shanghai subwayit is considered that the frozen soil curtain wall is made up of creep media, both soil in tunnel and upper structure are elastic materials, outside soil of the frozen soil curtain wall and structure of station are soil spring. Analysis of time-space effect on excavation and support in frozen soil curtain wall of tunnel is made by 3D FEM- MARC. The calculation results are in good agreement with the test values; so it shows that it is reasonable and creditable to analyze the time-space effects of frozen soil curtain wall by 3D FEM. Moreover, the stabilities of the bottom plate of station, frozen soil curtain wall and the structure of support are increased

文档评论(0)

1亿VIP精品文档

相关文档