- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
zx市场调研分析电力企业安全管理刘钦1
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- aap咸阳市场神州三号会议营销操作手册.doc
- aa维维利乐包上海市场推广方案.doc
- id稿件更换商品住房市场宏观调控机制的构成分析.doc
- ch市场营销环境.doc
- tafe市场营销课程模块.doc
- ibm的中国零售与消费品企业双向合作关系市场调查文卷.doc
- zx市场调研分析电力企业安全管理刘钦.doc
- quidway s 系列交换机 产品彩页国内市场版.doc
- ~~~~市场营销~~~~~~简答分析.doc
- ~月东莞房地产市场报告.doc
- 2025果洛州青少年校外活动中心招聘临聘教师和工作人员10人笔试备考题库及答案解析.docx
- 2025年哈尔滨市烟草系统事业单位人员招聘笔试备考试题及答案解析.docx
- 2025国家知识产权局专利局专利审查协作河南中心招聘15人笔试备考题库及答案解析.docx
- 2025贵州黔南州银行业协会招聘3人笔试备考题库及答案解析.docx
- 2025甘肃张掖市市直机关及参照公务员法管理单位遴选和选调公务员及参照公务员法管理单位人员17人笔试备考试题及答案解析.docx
- 2025湖南衡阳市耒阳市事业单位选聘124人笔试备考题库及答案解析.docx
- 2025贵州织金县人民医院招聘54人笔试备考题库及答案解析.docx
- 2025河北沧州市海兴县招聘事业单位人员41人笔试参考题库附答案解析.docx
- 2025广东广州市黄埔区萝岗街道综合发展中心招聘环卫工人3人笔试备考题库及答案解析.docx
- 2025黑龙江七台河七煤总医院招聘笔试备考题库及答案解析.docx
文档评论(0)