iecq hspm qc 电子与电器元件和产品有害物质过程管理.doc

iecq hspm qc 电子与电器元件和产品有害物质过程管理.doc

iecq hspm qc 电子与电器元件和产品有害物质过程管理

 PAGE 15 BVQI Guangzhou Translated March 2006 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting