- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国硕士研究生入学统一考试英语试题答案卓越资料
卓越考研 HYPERLINK / / 卓而优 越则成
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor sho
您可能关注的文档
- 人力资源管理专业知识与实务初级考试真题.doc
- 人力资源福建xxx药业度营销计划.doc
- 人力资源开发复习大纲与练习题.doc
- 人力资源管理(1.doc
- 人力资源管理专形成性考核册答案(1.doc
- 人力资源管理复习大纲(1.doc
- 人力资源管理员考试讲义串讲.doc
- 人力资源管理四级第三套模拟题.doc
- 人力资源管理复习资料(1.doc
- 人力资源管理实务课程标准.doc
- 全国技工院校师资培训一体化教学设计与实践模块任务书.doc
- 全国统一建筑装饰装修工程消耗量定额河北省消耗量定额宣贯资料.doc
- 全国执业兽医资格考试(1.doc
- 全国注册安全工程师执业资格考试安全生产法及相关法律知识全真模拟试题及答案.doc
- 全国房地产估价师执业资格考试房地产估价案例与分析试卷及答案.doc
- 全国统计专业技术中级资格考试统计工作实务真题及答案1.doc
- 全国统计专业技术中级资格考试统计工作实务真题及答案(1.doc
- 全国统计专业技术中级资格考试统计基础理论及相关知识真题及答案(1.doc
- 全国进出口商品检验鉴定资格考试复习题基础知识.doc
- 全国银行从业资格考试银行业法律法规与综合能力必过道题.doc
文档评论(0)