- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
步步高各项制度营销系统
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 月国际贸易理论基础考试试卷及答案.doc
- 月国际贸易理论基础考试试卷及答案1.doc
- 月号助理营销师考试真题及答案.doc
- 月初级卷烟商品营销职业技能试卷正文.doc
- 月狭义乘用车零售走势分析.doc
- 月电子商务网站设计原理试题和答案.doc
- 月国贸专业《电子商务与现代物流》复习题.doc
- 月电子商务设计师试题及答案.doc
- 月自学考试电子商务案例分析试题.doc
- 月自考真题国际商务英语.doc
- 2025年中山市沙溪镇人民政府所属事业单位招聘11人笔试备考题库及参考答案详解一套.docx
- 2025年中山市横栏镇人民政府所属事业单位第二期招聘笔试高频难、易错点备考题库及参考答案详解一套.docx
- 2025年中山市横栏镇人民政府所属事业单位第二期招聘笔试高频难、易错点备考题库含答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库及完整答案详解1套.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库参考答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库及答案详解一套.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库及完整答案详解1套.docx
文档评论(0)