- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浙江浦江县事业单位考试招考职位表下载
2014年浙江浦江县事业单位考试招考职位表2014年浙江金华浦江县部分事业单位招聘考试公告、报名注意事项、职位表考等最新资讯请点击:/news121983.html
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should
您可能关注的文档
最近下载
- 捕歼战斗中地排教案设计.doc VIP
- 深圳希莱恒电解质说明书.doc VIP
- 开展体育领域突出问题专项整治工作情况汇报.docx VIP
- 学校安全生产风险分级管控和隐患排查治理双重预防体系建设实施指南.pdf VIP
- 双眼视异常分析临床处理2020.pptx VIP
- 排捕歼战斗连贯演练.docx VIP
- Illustrator教程Illustrator绘图技巧Illustrator经典实例Illustrator网格工具绘制逼真花瓣.pdf VIP
- 民企混改公司合作协议书10篇.docx VIP
- 如何免费申请QQ号申请qq号方法.docx VIP
- Illustrator进阶技巧.pdf VIP
文档评论(0)