tpm_15_2_2004.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
tpm_15_2_2004

INSTALLATION INSTRUCTIONS SERIES 15-2 SERIES 15-2 TOP-OF-POLE MOUNT INSTALLATION INSTRUCTIONS Designed to hold up to 15 Sq. Ft. of solar modules and to mount on a 2” SCH 40 Pole First a word on our product: The Series 15-2 does not denote the specific number of modules to be mounted but rather the overall size of the array. The Series 15-2 is designed to hold up 15 square feet of modules and the rack mounts on a 2” Schedule 40 steel pole. The drawing on the front page depicts a two-module rack with two modules, each with dimensions of 21”x 47”, for a total area of approximately 13.7 square feet. However, like any Series that we manufacture, there are several Models that fall within each Series. For example, the model TPM2-SM55 holds two Shell SM55, 55 watt modules on the Series 15-2 structure design. Components: ?? 1ea. Strongback ?? 1ea. Mounting Sleeve with Pivot Bolt ?? 2ea. Module Rails ?? 1 lot rack assembly hardware ?? 4 - 3/8” x 1” Bolts ?? 4 - 3/8” Lock Washers ?? 8 - 3/8” Flat Washers ?? 4 - 3/8” Nuts ?? 1 lot 1/4” module mounting hardware ?? 4 Bolts, Lock Washers, and Nuts per solar module ?? 8 Flat Washers per solar module INSTALLATION INSTRUCTIONS 1. You will need a piece of 2” SCH40 steel pipe (2-3/8” OD) for a mounting pole. This piece of pipe should be approximately 8 feet long. Dig a hole 10”-12” in diameter and about 36” deep. Place the pole into the hole and pour concrete around it. Fill the hole to the top. Brace the pole plumb and let the concrete set up. 2. Place the Strongback/Mounting Sleeve assembly on the pole. 3. Bolt the Module Rails to the plates that are welded to the ends of the Strongback using the 3/8”X1” bolts, 3/8” flat washers, lock washers and nuts. 4. Mount the modules to the rack using the 1/4” hardware. Make sure all rack and module bolts are tight. Point the rack Sout

文档评论(0)

100101 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档