- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TWDDCV输入输出串并AW电源承认书深圳市天稳技术有限公司
深圳市天稳技术有限公司
Shenzhen TIAN WEN Technology Co.,Ltd
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale
您可能关注的文档
最近下载
- 第4课 认识编码 课件 黔科版信息科技四年级上册.ppt
- 漫漫自考路,悠悠自学情.docx VIP
- 2025年国培卫健、粤医云3月临床医学、全科医学答案.docx VIP
- 苏教版五年级上册数学试题第二单元测试卷-2(无答案).docx VIP
- 2024年中考数学压轴题型(浙江专用)压轴题06 相似相关压轴题(教师版).docx VIP
- 统编版语文三年级上册习作猜猜他是谁 公开课一等奖创新教学设计.docx VIP
- PSP版波斯王子启示游戏攻略.doc VIP
- 2025年中考数学压轴题专练:二次函数综合(面积问题)(含解析).docx VIP
- 2009~2012社保缴费基数(全国).pdf
- 2025年中考数学压轴题专练:二次函数与圆综合.docx VIP
文档评论(0)