Follow-up auditing of college construction projects.docVIP

Follow-up auditing of college construction projects.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Follow-up auditing of college construction projects

Follow-up auditing of college construction projects [Abstract] At present, university construction project monitoring system is not perfect, imperfect internal control system, financial management was not standardized and many other issues, the effectiveness of not only the goals of the audit, the audit is still a huge risk. Therefore, select the track audit of change college construction projects necessary requirement for auditing practices. [Keywords:] college construction project tracking audit Follow-up auditing of University construction projects, the essence of real-time audit, also known as simultaneous audit. Throughout its history, whether it is the early settlement of the audit, or the recent management audit, audit of the basic method is to post the main focus of the audit Shangqie remain in terms of cost control, audit value has not been fully reflected. The following combination of the author in recent years to explore, to talk about the college construction project tracking the audit process should be followed in the implementation of some of the key aspects and improvement measures. An audit of the college construction project tracking key 1. Choose the best track audit mode Can mainly be used to track audit two operating modes: first, the entire process of tracking the audit mode. From the construction project investment decisions, design, bidding, construction, acceptance of delivery, completion of the whole process of settlement of audit and supervision, and second stage of follow-up auditing mode . auditors under the project progress from one stage intervention, such as investment decision-making phase, design phase or construction phase began tracking. Choose which mode, there is no fixed limit, in theory, the earlier the intervention, the better the audit, but in practice difficult to operate. First, the auditor in evaluating the scientific aspects of pre-decision-making is the lack of professional competence, and s

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档