炼铁厂停炉方案英文.docxVIP

  • 5
  • 0
  • 约 8页
  • 2017-05-18 发布于重庆
  • 举报
炼铁厂停炉方案英文

PAGE \* MERGEFORMAT1 PAGE \* MERGEFORMAT8 STEEL SDN. BHD 《IMP 1# Blast Furnace Stoppage Proposal》 Prepared by: Yu Yu Fe Verified by: Zhe Ru, Che We Fen Approved by: Wan She Hu IMP 7/10/2015 1. Organization Commander: Zh Deputy Commander: Chen W, Woo Wing Nan, and Wang Tan Member: Chia Kay Kiat, Yu Feng, Wu Shi, Zha Tie, Li Gu Mi, Liu Qing Jiang, Yang Yu Fe, Su We, Wan Ju We, Guo We Zho, Liu Hai Qing Gao X Do, Wan Zh, Re Xia M, Wa Ha Cu, Gu Yo Ga, Ca Mi Ze, Yan Su Li, To Zhi Ga. 2. The shutdown time: 17 October 2015 (Estimated) 3. The shutdown method: lowering charge level, or

文档评论(0)

1亿VIP精品文档

相关文档