炼铁厂停炉方案英文
PAGE \* MERGEFORMAT1
PAGE \* MERGEFORMAT8
STEEL SDN. BHD
《IMP 1# Blast Furnace Stoppage Proposal》
Prepared by: Yu Yu Fe
Verified by: Zhe Ru, Che We Fen
Approved by: Wan She Hu
IMP
7/10/2015
1. Organization
Commander: Zh
Deputy Commander: Chen W, Woo Wing Nan, and Wang Tan
Member: Chia Kay Kiat, Yu Feng, Wu Shi, Zha Tie, Li Gu Mi, Liu Qing Jiang, Yang Yu Fe, Su We, Wan Ju We, Guo We Zho, Liu Hai Qing Gao X Do, Wan Zh, Re Xia M, Wa Ha Cu, Gu Yo Ga, Ca Mi Ze, Yan Su Li, To Zhi Ga.
2. The shutdown time: 17 October 2015 (Estimated)
3. The shutdown method: lowering charge level, or