- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《混凝土结构与砌体结构(下)》第09章在线测试 残剩时间:(国外英文资料)
《混凝土结构与砌体结构(下)》第09章在线测试 剩余时间:(国外英文资料)
Concrete structure and masonry structure (bottom) chapter 09 online testing
Remaining time:
33:06
The top of the form
? 1, this volume is 20 points out of 20.
??????????????? After you finish the question, please make sure to click the hand in hand button, or you will not be able to record the results of the paper.
??????????????? Dont refresh the page before you hand it in, otherwise your answer will be empty.
1, 1, 1, 1, 5, 5
? 1, with resistance to overturning moment design value according to the formula of Mr = 0.8 Gr (L2 - Xo) calculation, the Gr is with resistive overturning loads, it is to choose the upper end of a beam spread Angle 45 and floor permanent load within the scope of the masonry structure
The sum of the design values
The sum of the design values is 50%
The sum of the values of C and the standard
D, the standard value is 1.2 times
? The span of brick arch is not better than the span of the beam
A, 3 m
B, 2 m
C, 1.8 m
D, 1.2 m
? The wall beam calculates the height range only to allow to set up a hole, the wall girder of the multi-storey building, each layer hole appropriate to set in
A, different positions, and up and down
B, same position, and up and down
C, corner, and up and down
D, according to the building requirement, and up and down
? The height of the hb should be satisfied when the beams of a single support beam and the masonry of the upper part of the wall are used to support the wall and the load of the wall
A, Lo / 8 or more
B, Lo / 10 or more
C, Lo / 12 or more
D, Lo / 15 or more
? During the construction phase of the construction period, the torang beam is checked
A, reinforced concrete eccentricity of pull member
B, reinforced concrete eccentric compression member
C, reinforced concrete beam calculation
D, reinforced concrete torsional component calculation
Problem 2, multiple choice questions (2 points for each question, 10 points for 5 questions)
? The design content of the wall beam is includ
您可能关注的文档
- 2016届广州市高三第一次模拟测验理综物理试题及谜底(国外英文资料).doc
- 2016年专技人员公需科目培训(初级)测验3(国外英文资料).doc
- 2016试验人员继承教导收集平台-桩的基础常识试卷(国外英文资料).doc
- 2016二建继承教导试题(国外英文资料).doc
- 2016年水利检测员继承教导岩土(国外英文资料).doc
- 20点结构设计经历总结(国外英文资料).doc
- 2205双相不锈钢和它的机械性能(国外英文资料).doc
- 23连续梁(悬臂)挂篮施工检查监控要点(国外英文资料).doc
- 25-北邮收集教导学院卒业设计论文装订次序合格局请求(国外英文资料).doc
- 2016郑州专业技巧人员继承教导测验试题及谜底可查寻(国外英文资料).doc
最近下载
- 内务整理班会.pptx VIP
- 《世界的物质性》课件.ppt VIP
- 长沙理工大学继电保护课程设计—水电站35kV线路电流保护设计三段式电流保护整定计算工程设计.doc
- 1998—2019北京市中考数学试卷含详细解答(历年真题).pdf VIP
- 2025年新高考英语复习 听力满分策略+真题练习(学生版+解析版)含听力音频 .docx VIP
- DZT0316—2018-砂石行业绿色矿山建设规范.pdf VIP
- T∕BECC 002-2024 智算中心技术要求和评估方法.pdf
- 自我管理(中职通用职业素质课程)全套教学课件(220页).pptx VIP
- 医护人员岗位能力提升策略.pptx VIP
- 智能加工技术:课程标准解读与学习指南.docx VIP
文档评论(0)