- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建筑师房屋修建实务案例题汇编4(国外英文资料)
一级建造师房屋建筑实务案例题汇编4(国外英文资料)
A construction unit has obtained an engineering project by bidding for it. Party a and party b have signed the contract for the project price, and its main contents are: (1) the cost of the project is 8 million yuan, and the main materials cost is 70% of the construction value; (2) the advance preparation is 25% of the cost of the project; (3) the project shall be calculated monthly; (4) the guarantee fund for the project shall be 5% of the cost of the project and the warranty shall be maintained for half a year;
(5) the adjustment of the price of materials shall be adjusted according to the regulations, and the actual increase shall be 10% each month. The actual output of each month is shown in table 2.
The actual output value of each month is 2
month
1
2
3
4
5
Finished product
80
130
215
180
195
Question:
(1) what is the main content of the enterprise bidding decision?
(2) what is the prepayment for the project and how much of the buckle?
(3) what is the monthly payment for the project? How much is the accumulated project?
(4) what is the total cost of the project when the project is completed in May? How much does party a deal with balance payment?
Answer: the enterprise bid decision includes two main aspects: one is the selection of the bidding project; Second, the bidding decision of the project. The former is based on the analysis of the internal conditions and competition environment of the enterprise, and considers the enterprises business objectives. The latter is a bid for a specific project, which is generally referred to as a bidding decision for an engineering project. The bidding decision of the project includes both the project cost estimating decision and the bidding price decision.
(2) solution: 800 x 25% = 2 million yuan.
The buckle is 800-200170% = 5143,000 yuan.
(3) solution: in February, the project cost 1.3 million yuan, and the accumulated cost of the project 80 + 130 = 2.1 million yuan.
The total cost of the project
您可能关注的文档
最近下载
- 《七巧板》完整版教学课件.pptx VIP
- 定时交通灯控制设计.pdf VIP
- 浙大中控DCS系统操作规程.doc VIP
- 学校家长安全责任书.docx VIP
- 北师大版小学数学六年级上册第二单元 分数混合运算 基础测试题.doc VIP
- 2025至2030中国食用油行业运营态势与投资前景调查研究报告.docx VIP
- 10.3 合同的变更、转让、解除和终止(政策与法律法规 第7版).pptx VIP
- 儿童肺炎支原体肺炎诊疗指南2025年版解读PPT课件.pptx VIP
- 深圳初一数学下学期期中模拟测试题(带答案).pdf VIP
- 2023年春国开(甘肃)《个人理财》形考任务1-4题库.docx
文档评论(0)