卸料平台制作与装置标准(国外英文资料).docVIP

卸料平台制作与装置标准(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
卸料平台制作与装置标准(国外英文资料)

卸料平台制作与安装标准(国外英文资料) The discharge platform offers a plan Greentown escape water garden 3 #, 5 # floor, shear wall structure, the floor 13 and 15 layers, respectively, for 39 meters, 45 meters high, in order to transport materials in the process of subject construction is convenient, turn makings platform shall be built. According to the requirements of the construction inspection standard, the platform is designed as a suspension platform. Design basis Safety technical specifications for high construction work safety (jgj80-91) Safety technical specifications for structural steel pipe scaffolding (jgj130-2001) Steel structure design specification (gbj17-88) Standards for building safety inspection (jgj59-99) Second, the design plan Specification: the main beam is 6 meters long, the second beam is 1.8 ~ 2.0 meters long and the platform is 3.6 meters long. The main beam adopts [16 channel steel, the secondary beam adopts [10 channel steel; the steel wire rope with the diameter of 20mm is adopted. Third, production rules The material such as groove steel, steel wire rope, steel pipe fastener, foot hand plate, steel plate and so on meet the requirement. The use of corrosion, deformation, damage, and beyond the specification is prohibited. The channel used in the discharge platform shall be treated with rust prevention and the paint shall be bright yellow. 33.3 discharge platform welding personnel must hold the certificate and sign the acceptance form. The steel ring must be welded to the outside of the main beam channel, the connecting mode of the main beam and the secondary beam shall be welded, and the weld height shall not be lower than the thickness of the section. The platform is covered with 50mm planks, with flat steel. The center of the flat steel is 100mm of perforation, fixed with iron nails, and flat head welded to the main beam. The discharge platform shall handle the safety technology of the relevant personnel prior to the production and installation, and

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档