津县盐窝政和小区5#住宅楼综合布线投标毕业设计报告.docVIP

  • 8
  • 0
  • 约8.88万字
  • 约 181页
  • 2017-05-21 发布于江苏
  • 举报

津县盐窝政和小区5#住宅楼综合布线投标毕业设计报告.doc

津县盐窝政和小区5#住宅楼综合布线投标书 摘 要 毕业设计是根据利津县盐窝政和小区5#住宅楼工程的招标文件的招标须知、合同条件、技术规范、图纸及其他有关文件而编制的投标书。 该毕业设计包括:商务标、技术标和结论。商务标包括编织的依据、范围、工程量计算过程及说明、工程造价的确定和工料分析;工程量计算规则按照相应的计算规则计算,工程造价则是应用清单套价,土建部分采用以人工费、材料费和机械费为计算基础的计价程序,装饰部分采用以人工费为计算基础的计价程序。技术标则包括工程概况、施工组织及部署、施工前的准备、施工平面布置、各项管理措施、工程质量的控制措施及安全文明施工措施等。技术标是从人、材、机方面来进行施工布置,从技术、施工、物资等方面采取措施来确保工程进度、工程质量与施工安全,并在此基础上降低成本。 关键词:标书;商务标;技术标;工程量;施工方案 Abstract Graduating the design is based on County salt Waterloo governance and community 5# residential building project of the bidding project bidding documents, contracts, notes in the specification, the drawings and other relevant documents and compiling tender. The design includes: commercial bid documents, technical bid documents and conclusioin. Commercial bid documents including astablishment basis, scope, resilience computation process and explanation, project construction cost determination and manpower and materials analysis; The engineering quantity computation rule according to “the calculation rules quantity valuation of shandong province”, the calculation rules project cost is the application of price list, based on artificial materials, machinery and fee for calculating the valuation of foundation program.Technical standard, including engineering, construction organization and the deployment of preparation before construction, construction, layout, management measures, the design scheme of optimization and reduce cost. Technical standard from people, materials, machines aspects to decorate, construction technology and construction materials, from the aspects of measures to ensure the project schedule, quality and safety of construction projects, and on this basis to reduce costs. KEY WORDS:bid documents; commercial bid ducuments; technical bid documents; engineering quantity; construction scheme 目 录 摘 要 I Abstract II 上篇 商务标部分 1 第1章 总论 2 1.1 投标总价 2 1.2 总说明 3 1.3 工程项目投标报价汇总表 4 1.4 单项工程投标报价汇总表 5 1.5单位工程费汇总表 6 第2章 土建部分 9 2.1 分部分项工程量清单与计价表 9 2.2 工程量清单综合单价分析表 16 2.3 措施项目清单与计价表(一) 81 2

文档评论(0)

1亿VIP精品文档

相关文档