- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
这是精心收集的精品经典资料,值得下载保存阅读!
The Process of the Cut and Cover Method The Process of the Cut and Cover Method The Process of the Cut and Cover Method The Process of the Cut and Cover Method The Principle of the Slurry Shield Method Types of Shield Tunnels New Shield Methods Removable Triple-Faced Slurry Shield New Shield Methods Nested Parent-Child Slurry Shield Construction of Station Using the Cut and Cover Method Introduction Identification of potential wedges Support to control wedge failure Support to control wedge failure Consideration of excavation sequence Deformation around an advancing tunnel Deformation around an advancing tunnel Tunnel deformation analysis Tunnel deformation analysis Tunnel deformation analysis Tunnel deformation analysis Dimensionless plots of tunnel deformation Dimensionless plots of tunnel deformation Dimensionless plots of tunnel deformation Dimensionless plots of tunnel deformation Dimensionless plots of tunnel deformation * * Subway Construction Technology Preparation for construction ?Investigation of the underground utilities ?Transplanting trees and shrubs ?Relocation of the underground utility lines ?Relocation of the roadside facilities ?Reduction of sidewalk space Building an Earth Supporting-Wall ?Column-type diaphragm ?Wall-type diaphragm ?Setting H shape Steel Subway Construction Technology Placing temporary road deck Excavation work Excavation The placement of waling and strutting Suspended Guard of Underground Utilities Subway Construction Technology Construction of Structure Placing reinforcement bar Forming work Casting in concrete Subway Construction Technology Backfilling Work Removal of Temporary Road Deck Pile Removal Restoration of the Underground Utilities Reconstruction of the Road Subway Construction Technology Subway Construction Technology Single Track Double Track Triple Track Eyeglass-Type Station Removable Triple-Faced Shield Triple-Faced Shield (island platform) Subway Construction Technology Removable Triple-Faced Slurry Shield
您可能关注的文档
- 土力学第三章1.ppt
- 土力学绪论3.ppt
- 土力学答案6.doc
- 土力学答案3.doc
- 土力学考试要点1.ppt
- 土力学第七章1.ppt
- 土力学第六章1.ppt
- 土力学第四章(Yu).ppt
- 土力学第六章2.ppt
- 土力学教案-工管2.ppt
- 2025-2026学年湘美版2019美术鉴赏-湘美版2019教学设计合集.docx
- 2025年太阳能海水淡化技术在海岛生态旅游中的应用研究报告.docx
- 2025年城市新能源汽车共享充电跨境服务网络市场潜力与风险并存.docx
- 新能源汽车市场销售市场潜力与增长趋势分析报告.docx
- 2025年城市新能源汽车共享充电跨境服务网络智能充电技术与设备研发趋势报告.docx
- 2025-2026学年湘美版九年级下册-湘美版教学设计合集.docx
- 未来5年脑机接口技术知识产权布局与行业政策解读.docx
- 工业机器人智能化关键技术路径与产业生态构建报告.docx
- 智能穿戴设备用户消费习惯与偏好2025年趋势报告.docx
- 2025年城市新能源汽车共享充电跨境服务网络用户满意度与忠诚度研究报告.docx
文档评论(0)