金属监督和试验检验大纲详解
表Table A.4 方案报审表Examination Table for scheme
工程名称 :中国电工泰国TPI PP垃圾发电厂二期工程 编号NO.:[SPESC]-FABS-JS-001
Project name: TPI PP RDF POWER PLANT PHASE 2
致:中国电工泰国TPI PP垃圾发电厂二期工程 项目监理机构
To: TPI PP RDF POWER PLANT PHASE 2 project supervisory agencies
现报上 无损检测作业指导书 工程施工方案/安全方案/调试方案/特殊施工技术方案/采购方案/工艺方案/事故处理/节能减排/水土保持/环境保护方案,请审查。
The Non destructive testing work instruction engineering construction scheme / safety scheme/ debugging scheme / special construction technical scheme / purchase scheme / process scheme / accident treatment/ energy-saving emission reduction / soil and water conservation / environmental protection scheme, please examine.
附件: 1. 无损检测作业指导书(检验大纲、射线、超声、渗透、光谱、硬度、涡流) 1份
Attachment:1.Non destructive testing work instruction(Inspection outline, ray, ultrasound, penetration, spectrum, hardness, eddy current) one copy
承包单位项目经理Construction unit manager:
日 期Date: 专业监理工程师审查意见
Profession supervision engineer review comments:
专业监理工程师Profession supervision engineer:
日 期Date: 总监理工程师审查意见
Chief supervision engineer review comments :
总监理工程师Chief supervision engineer:
日 期Date: 总包单位审批意见
EPC contractor approval comments:
总包单位项目经理EPC contractor project manager:
日 期Date: 填报说明:本表一式3份
您可能关注的文档
最近下载
- (高清版)DB31∕T 1487-2024 国际医疗服务规范.docx VIP
- 精益管理措施在医院手术室医用耗材管理中的应用.pdf VIP
- 2026及未来5年中国商务男装市场运行态势及战略咨询报告.docx
- 泸州市高2023级(2026届)高三(一诊)数学试题(含标准答案).pdf
- 新城地产商开目标成本主要科目价格测算标准-定稿.pptx VIP
- 12月1日艾滋病宣传日活动方案模板(集锦5篇).docx VIP
- 2024年湖南铁道职业技术学院单招计算机测试模拟题库必考题.docx VIP
- 遗产分割起诉状.docx VIP
- 2021年重庆市中考物理真题(a卷).pdf VIP
- 2025年度民主生活会对照检查材料8篇五个带头合集.docx VIP
原创力文档

文档评论(0)