JS waterproof coating construction technology 2(国外英文资料).docVIP

JS waterproof coating construction technology 2(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
JS waterproof coating construction technology 2(国外英文资料)

JS waterproof coating construction technology 2(国外英文资料) JS waterproof coating construction technology 1, the ingredients The ratio of the weight of the DJS to the coating is liquid: water = 1:1. The weight ratio of the lower, middle and upper coatings is liquid: water = 1:1. The coating can be mixed with paint to form the color layer, and the weight ratio of the color layer coating is the liquid material: the pigment: water = 1:1. 2:0.1:0.2. Type JS - II type the underlying ingredients as liquid: powder: water = 1:1. 6:1. The middle and upper toppings are liquid: water = 1:1. 6:0.3. The coating should be well stirred to make no powder. 2, coated Use roller or scraper to complete the sequence. The time between each layer is before the time interval. You should pay attention to the following items: The deposition of the coating (especially the bottom coating) should be stirred at any time. The coating should be as uniform as possible, no local deposit, and the requirement to brush several times to keep the paint from being bubbling and sticking to the ground. 2.3, each coating must be taken according to the prescribed amount, not too thick or too thin, if the waterproof thickness is not enough, the coating can be added to one or more layers. Protective and decorative layer construction JS - type I protective layer or decorative layer construction must be completed in the waterproof layer 2 days later, paste the piece of material (such as floor, ceramic tile, Mosaic, etc.), will be JS coating according to the liquid, powder into = 1:2 putty shape, can be used as adhesive. The js-ii can be covered in the face layer and also with a protective coating. Quality requirements and engineering inspection Waterproof layer construction is completed, shall carefully check each part of the whole project, especially the weak link, found that the problem timely repair, coating should not have crack, become warped edge, bubbling, layering, wait for a phenomenon. It is necessary to w

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档