- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
论开挖管道施工放线测量(国外英文资料)
论开挖管道施工放线测量(国外英文资料)
The construction of excavated pipe line is measured
With the development of urban areas, many underground pipelines will be laid, such as water supply, sewage, drainage, gas and cable. Various pipes are interleaved and interleaved. Therefore, during the construction process, the measuring work should be carried out strictly according to the design requirement, and the inspection will be done so as to ensure the quality of the construction. The main task of the pipe construction survey is to provide the construction personnel with the Central Line direction and the elevation position according to the requirement of the project schedule.
First, the measuring work before construction
Familiar with drawings and survey scene
Pipe should be collected before construction, measuring need piping layout, and vertical and horizontal profile, planning pipeline ancillary structure and related data, check the design drawings, familiar with and understand the accuracy requirement and construction schedule arrangement, but also deep into the construction site, familiar with the terrain, to find the intersection pile, pile and pile, mileage standards point location.
2, restore the midline
Pipe line measurement when the nail set intersection of pile and the midline pile during construction there may be some touch and loss, in order to guarantee the midline position accurate and reliable, should carry on the review, and will touch and the pile point to restore lost. In the recovery of the midline, the position of the auxiliary structures such as well and branch shall be measured simultaneously.
Set up construction control pile
On line during the construction of the pile to be cut, in order to restore the midline and ancillary structure position, should be in without interference, putright convenient, easy to save layout construction control of pile pile location. Two kinds of piles are controlled by the middle line control pile and the auxiliary structure.
Encrypt