18米跨度梯形屋架(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
18米跨度梯形屋架(国外英文资料)

18米跨度梯形屋架(国外英文资料) Steel structure design 8-27 2013 The instructor 18m span ladder steel roof frame With five Student id 1. The design data The length of a workshop is 180 m, and the column is 6 m. There are two 20/5t intermediate working cranes in the workshop. Calculated temperature above 20 ℃, seismic fortification intensity of 7 degrees. Adopting the 1.5 x 6m2 prestressed reinforced concrete roof slab, 8cm thick foam concrete insulation layer, coil roof. The snow load is 0.4 kN/m2, the ash load is 0.75 kN/m2, and the frame of the roof is on the reinforced concrete column, the column section is 400 by 400, and the concrete mark is C20. The design of the roof is required. Roof form and load Without the scheme of the purlin house, the slope of the roof is 1/10, and the roof of the slope trapezoid is adopted. The roof computing span is L0 = l-300 = 17700mm, the end height is H0 = 2015mm, the middle height H = 2900mm. According to the calculation temperature and load properties of the construction area, the steel is chosen from q235-b, and the electrode adopts E43, which is manual welding. Permanent standard value: 2 felt 3 oil and 1 pebbles 0.35 kN/m2 Find the flat layer (2cm thick) 0.40 kN/m2 Foam concrete insulation (8cm thick) 0.50 kN/m Prestressed concrete large roof slab (containing seam) 1.40 kN/m2 The steel roof and support itself are 0.12 + 0.011 times LkN/m2 The plumbing equipment weighs 0.10 kN/m2 Live load standard: 0.70 kN/m2 Snow load standard: 0.50 kN/m2 The standard value of the ash load: 0.75 kN/m2 Load internal force calculation 1. Load calculationPermanent load standard value 2 felt 3 oil and 1 pebbles 0.35 KN/m2 The leveling layer (2cm) is 0.40 KN/m2 Foam concrete protective layer 8cm 0.45 KN/m2 Prestressed concrete large roof slab 1.. 40 kn/m2 The steel roof and the support value are 0.12 + 0.011 * L KN/m2 = 0.318 KN/m2 The plumbing equipment weighs 0.10 KN/m2 Total 3.018 KN/m2 Live load: 0.70 KN/m2 snow load: 0.50 KN/m2 soot load: 0.75 KN/m2 Desi

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档