信息资源管理第二章(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
信息资源管理第二章(国外英文资料)

信息资源管理第二章(国外英文资料) A, single topic selection 1, in a certain constraint conditions, to effectively achieve the goal of project, according to the inherent law and the procedure of the project, the whole process of the project for effective planning, organization, coordination and control of system management activities is (D) A, project plan B, project plan C, project construction D, project management The project manager can use () to control the whole development effort A, administrative measures B, economic leverage C, capital D, human schedule Control the operation of the information system. Record its operation status and make necessary changes and expansion. A, the information system project management B, the information system operation management C, information system maintenance upgrade D, information system evaluation 4, project risk management can be divided into four steps, including the identification of risk after the track in the process of system design and development management, determine which change, there will be the steps for timely correction plan is () A, risk identification B, risk analysis C, risk mitigation D, risk tracking The project development strategy for large, complex projects is () A, linear B, linear iteration C, complex legal D, prototype method 6, from the perspective of quality management, the sooner a mistake, the more likely it is to change, if the system analysis phase hidden errors to revising system operation stage. The cost will be revised in time () A, 4 times B, 2 times C, 8 times D, 30 times The first phase of a large project can be divided into four stages, with the opportunity to study () A, identify the investment orientation phase B, the selection phase C, qualitative phase D, decision stage One of the important elements of the information system development project management is the development plan, including the acceptance plan (). Prepare the inspection document and verify the quality of development Verify the de

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档