后张法简支箱梁预应力施工工艺(国外英文资料).docVIP

后张法简支箱梁预应力施工工艺(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
后张法简支箱梁预应力施工工艺(国外英文资料)

后张法简支箱梁预应力施工工艺(国外英文资料) After the construction of the box girder of the box girder China railway 19 group, no.5 engineering co., LTD Keywords: three control, strength, elasto, age, control stress, tension, periodic calibration, periodic calibration, before use Content abstract: Zhang Fajian box girders after prestressed construction, the tensioning equipment including pumps, jacks, magnitude 0.25 shock oil pressure gauge, 1 x 7-15.2-1860 mpa raw materials adopt low relaxation strand. According to the process construction of the prestressed construction process, the drawing of the rod, the cleaning, the steel wire, the wire transfer, etc. The prestressing stress is performed in the three stages of pre-tensioning, the initial tension and the final tension, and the pre-tensioned three control: when the concrete reaches 35.5 MPa, the pre-tensioning can be carried out. Strength to meet the design requirements of 43.5 MPa, can be carried out at the beginning of tension, according to the site condition, forecast, early tension can be simultaneously, and advance, initial tension belt tension, tensioning the rear end of the movable beam; When the intensity of the concrete reached 53.5 MPa, and the modulus reached 35.5 GPa, the age was greater than 10 days. In the process of tension, the prestressed value is mainly the oil gauge reading, the extension value is auxiliary, and the three concentric, two synchronization. Prestressed equipment to do: periodic verification (jack use more than 1 months or 200 times), regular calibration (hydraulic table by collision or oil leakage, oil pointer cannot be returned to the zero point) and before using the check (tensioning, determine if the hydraulic table and jack is properly matched; make jack empty 2-3 times, determine the jacks and hydraulic pipe works) to ensure the construction process, the equipment can work normally. At the time of zhang, a warning sign and a police cordon were set on both sides of the beam. After tension, you sh

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档