- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基础C20砼质量验收评定表(国外英文资料)
基础C20砼质量验收评定表(国外英文资料)
The quality acceptance evaluation form of the process construction
Unit engineering name
Reinforcement works for the futian temple in honghu, hubei province
Process id
Project name
Housing construction project (01-07)
Construction unit
Xiantao water conservancy and hydropower construction engineering co., LTD
Unit engineering name, site
Beam, board, column C25 concrete, production occupancy (01-07-17)
The construction date
April 2014 ~ 2014
For a time
Inspection items
Quality standard
Check the records
Number of qualified
Percent of pass
The main
control
item
Orders,
one
Rebar production and installation
qualified
detection
2
Concrete casting (including curing, stripping)
qualified
Meet the design requirement
3
4
5
6
a
a
item
Orders,
one
Basic surface and construction seam treatment
qualified
Meet the design requirement
2
Template installation
qualified
detection
3
Inspection of appearance
qualified
Meet the design requirement
4
5
6
Construction unit
Self-reported opinion
The main control project is 100% qualified, and the average item is % of the inspection points, and the disqualified points are not distributed.
The process quality rating is:
Date of the year
Supervision unit
Review opinions
The test point of the main control project is 100% qualified, and the average item is up to % of the inspection points, and the distribution is not concentrated.
The process quality rating is:
Date of the year
Unit construction quality acceptance evaluation form (division process)
Unit engineering name
Reinforcement works for the futian temple in honghu, hubei province
Unit of quantities
M?
Project name
Housing construction project (01-07)
Construction unit
Xiantao water conservancy and hydropower construction engineering co., LTD
Unit engineering name, site
Beam, board, column C25 concrete, production occupancy (01-07-17)
The construction date
The date of the month of 2014 ~ the date of the year of 2014
Items are
Procedure number, name
Process quality ac
您可能关注的文档
最近下载
- 人力资源管理课后答案德斯勒.docx
- 马克思主义新闻观十二讲之第九讲实现新闻传播权利与社会责任的统一.docx VIP
- 国际航运管理 全套课件.PPT VIP
- 财务共享服务教学课件4第四章 费用报销流程.pptx VIP
- 手术患者意外伤害预防.pptx VIP
- 2025年新人教版数学7年级上册整册同步教学课件.pptx
- 广告理论与实务:各类广告媒介PPT教学课件.pptx VIP
- 第1课 课题一《课外生活小调查·周末生活我采访》(教学设计)-2024-2025学年三年级上册综合实践活动浙教版.docx VIP
- 广告理论与实务:印刷媒体广告PPT教学课件.pptx VIP
- 铭记历史·开创未来--2025-2026学年高一上学期纪念抗日战争胜利80周年爱国主义教育主题班会.pptx VIP
文档评论(0)