市政卷jta(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政卷jta(国外英文资料)

市政卷jta(国外英文资料) In 2007, the qualification examination for construction project cost of jiangsu construction project The municipal cost case analysis examination paper qid a The second three four five six seven Total score Scoring a person Nuclear points people score Note: This volume is a case analysis problem, the primary is 1 ~ 5, the total score is 100, the middle is 2, 3, 4, 5, 7, the advanced do 2, 3, 5, 6, 7, the total score is 120. The analysis is reasonable and the conclusion is correct. score One. A road construction pile number of 0 + 050 to 0 + 550, road width of 10 m, shoulder width 0.5 m each, for three kinds of soil, soil fill required compactness reached 93% (10 t vibration road roller), road digging 3980 m3, fill 2080 m3. Construction USES 1 m3 backhoe excavator to dig three kinds of earth. The earth balance is excavated and the ground is transported 50 meters (75 kw bulldozer pusher) without considering the mechanical entrance and exit. The rest of the party abandoned the plans for the construction of land for the use of people, and transported 3 km (8t) of self-discharging vehicles (8t). The road bed is run over the width of the road by 30cm. According to the above situation, the project quantity list of the road earthworks project is to be itemized. (people, materials, machine prices and rates are not adjusted in accordance with the 2004 municipal project of jiangsu province.) A list of integrated unit price lists for subdivision of works Project name: a road units: Encoding of the project: project number: Project name: comprehensive unit price: The serial number Fixed number Working capacity unit The number of Among them: (yuan) Artificial cost Cost of raw materials Mechanical fee The management fee profits subtotal conmeter A list of integrated unit price lists for subdivision of works Project name: a road units: Encoding of the project: project number: Project name: comprehensive unit price: The serial number Fixed number Working capacity unit

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档