水工建筑物2(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水工建筑物2(国外英文资料)

水工建筑物2(国外英文资料) The course assignments and evaluations are done The reform of the talent training model of the central radio and television university and the opening of the education pilot program The water workers building forms a sex examination book School name: black large remote education Students name: zheng limin Student number: 1123001258326 Class: 11 fall Ben The establishment of the central radio and television university Surname: li ying ying No. : 1123001258326 Score: Teachers signature: Assignment 3 Drainage buildings One, the question: The spool axis and the overflow weir axis are close to the parallel shore spillway, which is known as the side groove spillway. (square root) The direction of the overflow of the spillway is the same as that of the drain line. (square root) The water in the spillway is a torrent. (square root) The see-through plate has the effect of passing the load on the structure and water pressure to the foundation, so the bottom plate is thicker. (x) During the seepage analysis of the sluice chamber, it is assumed that the seepage of the water head is the same as the slope of the contour of the foundation, which is called the straight line method. (square root) The stable computing method of the sluice chamber is the same as the gravity dam. (x) The effect of the water sluice is to further reduce the residual energy of the current, protect the safety of the dam, and adjust the flow velocity distribution, protect the riverbed and prevent the erosion. (square root) Two, one choice question: After the weir current is about 90 degrees, the spillway is called (C). A, a vertical well spillway b, and a positive spillway C, side channel spillway, siphon spillway When the water is in the water under the dry water, the floodgates will be opened, and the floodgates may be (A).  A, the brake b, the flood gate C, sluice gate d, damper In the lock chamber of the sluice, the part (B) is used to divide the brake hole and support the gate. A, base

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档